SAP ABAP Data Element VKOPO (Consider contract data from header or item)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BF (Application Component) Basic Functions
⤷ VA0C (Package) Customizing R/3 sales
⤷ CRM-BF (Application Component) Basic Functions
⤷ VA0C (Package) Customizing R/3 sales
Basic Data
Data Element | VKOPO |
Short Description | Consider contract data from header or item |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VKOPO | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ContrData |
Medium | 15 | Contract data |
Long | 21 | Consider contrct data |
Heading | 1 | C |
Documentation
Definition
Set this indicator is you don't want the system to determine the baseline date from the current reference date (for a header rule these would be the header dates and for an item rule, the item dates) but explicitly from the header dates.
Example
There are 2 items in a contract with billing plans. However the contract items have differing contract start or end dates. In order to ensure that the billing plans have the same start and end dates, you can define the date rule so that it refers to the header date. This means that the start and end date for the item-date rule will always be determined from the header date in the document.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |