SAP ABAP Data Element VERSN_S (Sender version)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KE (Package) Profitability Analysis
Basic Data
Data Element VERSN_S
Short Description Sender version  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type COVERSI    
Data Type CHAR   Character String 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table TKVS    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID KVS  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Sender vrs 
Medium 15 Sender version 
Long 20 Sender version 
Heading SVs 
Documentation

Definition

For each controlling area, a collection of year-dependent indicators for planning data, such as

  • Delta version
  • Lock version
  • Integrated planning
  • Allow copying
  • Iterative price
  • Average prices
  • Exchange rate type
  • Value date

Use

There is one specific version for actual and planned costs (version 0) in each controlling area. The SAP System creates this version automatically when you set up a controlling area. You only need to maintain the fiscal year data for planning in version 0.

In addition to version 0, you can create any number of extra planning versions in which you can enter planning figures using the planning transactions.

When posting actual costs you do not have the option of entering a version. The actual values are automatically posted to version 0.

Version 0 is unique in that prices from the version's activity types are used for allocating actual costs. This means that you need to plan your prices in activity type planning

  • In Version 0 only, or
  • Copy your alternative version to Version 0 before posting actual costs for the first time, if you want to use these prices for direct activity allocation.

For planning, you need to maintain the following fiscal year parameters:

Fiscal Year Parameters

In Activity Based Costing you can also use a delta version by specifying a valid version that can be used for reference. Once you have done this, the current version is designated as a delta version. When you use a delta version, you need to specify the business transactions to be added to the delta version in "Own transactions of delta version".

History
Last changed by/on SAP  19960103 
SAP Release Created in