SAP ABAP Data Element UTTRM (Forward scheduling to the minute for KANBAN sum. JIT calls)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MD05 (Package) Development class KANBAN
⤷
⤷
⤷
Basic Data
| Data Element | UTTRM |
| Short Description | Forward scheduling to the minute for KANBAN sum. JIT calls |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | To minute |
| Medium | 15 | Sched. to min. |
| Long | 20 | Sched. to minute |
| Heading | 1 | M |
Documentation
Definition
For summarized JIT calls it is possible to define an exact delivery time (i.e. to the minute).
If you choose this option, when a kanban is set to EMPTY, scheduling is carried out as forward scheduling with the data from the kanban calculation (replenishment lead time in hours:minutes from the control cycle and shift sequence from the kanban calculation profile) and this delivery date is transferred into the summarized JIT call.
History
| Last changed by/on | SAP | 20041209 |
| SAP Release Created in |