SAP ABAP Data Element UTTRM (Forward scheduling to the minute for KANBAN sum. JIT calls)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
Basic Data
Data Element | UTTRM |
Short Description | Forward scheduling to the minute for KANBAN sum. JIT calls |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | To minute |
Medium | 15 | Sched. to min. |
Long | 20 | Sched. to minute |
Heading | 1 | M |
Documentation
Definition
For summarized JIT calls it is possible to define an exact delivery time (i.e. to the minute).
If you choose this option, when a kanban is set to EMPTY, scheduling is carried out as forward scheduling with the data from the kanban calculation (replenishment lead time in hours:minutes from the control cycle and shift sequence from the kanban calculation profile) and this delivery date is transferred into the summarized JIT call.
History
Last changed by/on | SAP | 20041209 |
SAP Release Created in |