SAP ABAP Data Element TSTRIDSD (Working time from sales view)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-BF (Application Component) Basic Functions
     VLTS (Package) Time segment
Basic Data
Data Element TSTRIDSD
Short Description Working time from sales view  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TSTRID    
Data Type CHAR   Character String 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table TTSTR    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Work. time 
Medium 15 Working times 
Long 20 Working times 
Heading 10 Work. time 
Documentation

Definition

Work times of the workdays defined in the factory calendar.

Use

If work times are defined, lead times can be set in hours/minutes and applied to the work times.

The following priorities are used for scheduling:

  • Factory calendar and work times maintained
    • The lead times are used in hours / minutes work time. Here, both the work days defined in the calendar as well as the work times on the individual weekdays (Monday through Sunday) are taken into consideration.
    • Additionally maintained lead times in calendar days are possibly not taken into consideration if the lead times are not maintained in hours/minutes. The work time would then be zero from the schedulung view.
  • Factory calendar maintained
    • The work times in calendar days are used and the workdays defined in the calendar are included. From the scheduling view, each day has 24 hours (in contrast to the lead time in hours/minutes where the work times are taken into consideration).
    • Additionally maintained lead times in hours/minutes are possibly not taken into consideration if the lead times in calendar days are not maintained. The work time would then be zero from the scheduling view.
  • No factory calendar maintained
    • As above, the system calculates only using calendar days, and work-free days, such as weekends or public holidays, are not taken into consideration.