SAP ABAP Data Element TSTRIDSD (Working time from sales view)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BF (Application Component) Basic Functions
⤷ VLTS (Package) Time segment
⤷ CRM-BF (Application Component) Basic Functions
⤷ VLTS (Package) Time segment
Basic Data
Data Element | TSTRIDSD |
Short Description | Working time from sales view |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TSTRID | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table | TTSTR |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Work. time |
Medium | 15 | Working times |
Long | 20 | Working times |
Heading | 10 | Work. time |
Documentation
Definition
Work times of the workdays defined in the factory calendar.
Use
If work times are defined, lead times can be set in hours/minutes and applied to the work times.
The following priorities are used for scheduling:
- Factory calendar and work times maintained
- The lead times are used in hours / minutes work time. Here, both the work days defined in the calendar as well as the work times on the individual weekdays (Monday through Sunday) are taken into consideration.
- Additionally maintained lead times in calendar days are possibly not taken into consideration if the lead times are not maintained in hours/minutes. The work time would then be zero from the schedulung view.
- Factory calendar maintained
- The work times in calendar days are used and the workdays defined in the calendar are included. From the scheduling view, each day has 24 hours (in contrast to the lead time in hours/minutes where the work times are taken into consideration).
- Additionally maintained lead times in hours/minutes are possibly not taken into consideration if the lead times in calendar days are not maintained. The work time would then be zero from the scheduling view.
- No factory calendar maintained
- As above, the system calculates only using calendar days, and work-free days, such as weekends or public holidays, are not taken into consideration.
History
Last changed by/on | SAP | 19991014 |
SAP Release Created in |