SAP ABAP Data Element TCJO1DSPKZ (Order Plan Values as Assigned Funds in the Planning Phase)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
KAHF (Package) Business reporting in Project System
⤷
⤷
⤷
Basic Data
| Data Element | TCJO1DSPKZ |
| Short Description | Order Plan Values as Assigned Funds in the Planning Phase |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Fds cmmt |
| Medium | 15 | Asgn Fd in Plan |
| Long | 20 | Assign Funds in Plan |
| Heading | 17 | Asgn Fund in Plan |
Documentation
Definition
If you select this indicator, the plan values for an order with status "Opened" are entered in the assigned values for the PSP element as order requests.
Note:
The remaining plan (plan minus actual minuse commitment) for released orders for the projectr always increases the assigned value for the relevant WBS element as an order request.
Exception:
Plan values for networks used in preliminary planning are not displayed as order requests.
You use the network type to determine whether a network is used for for preliminary planning.
Further information
History
| Last changed by/on | SAP | 19960115 |
| SAP Release Created in |