SAP ABAP Data Element TB_BEUAVWR (Revised Amount for Disbursement Obligation in Euro)
Hierarchy
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
   FS-CML (Application Component) Loans Management
     FVVD (Package) Treasury Loans
Basic Data
Data Element TB_BEUAVWR
Short Description Revised Amount for Disbursement Obligation in Euro  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8_TR    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 20    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 EuroConvDO 
Medium 20 Euro-ConvDisb.Oblign 
Long 35 Euro-Conversion Disbursement Oblign 
Heading 20 Euro-ConvDisb.Oblign 
Documentation

Definition

Indicates the value at which the disbursement obligation was converted to euros in the context of a contract currency changeover (CCC).

Use

The amount is automatically determined in the context of the CCC and entered in the cash flow as a posted flow. The calculation is made as follows:

First of all, the disbursement obligation is determined in the original currency at the key date for the changeover. If the amount is zero, it must also remain zero after the CCC.

To ensure this, the disbursement obligation is calculated once more after the amounts have been converted to euros. Any amount not equal to zero is entered in the cash flow as a separate, posted flow to adjust the disbursement obligation, but is not posted to FI.

Dependencies

Example

Contract capital before conversion: DEM 100.00

Division into two disbursements of DEM 50.00

After the CCC, the contract capital amounts to EUR 51.13.
The total for both disbursements amounts to EUR 25.56 + EUR 25.56 = EUR 51.12.
According to this calculation a disbursement obligation of EUR 51.13 EUR 51.12 = EUR 0.01 would exist.
This is not permissible, however, as the loan was disbursed in full prior to the CCC.
Reducing the disbursement obligation by EUR 0.01 means that this is zero after the CCC too.

History
Last changed by/on SAP  20030326 
SAP Release Created in 200