SAP ABAP Data Element TAKT (Takt time in the production campaign)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-PI-PCM (Application Component) Production Campaign
⤷ COPC (Package) Production campaign
⤷ PP-PI-PCM (Application Component) Production Campaign
⤷ COPC (Package) Production campaign
Basic Data
Data Element | TAKT |
Short Description | Takt time in the production campaign |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QQUAN5 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 6 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Takt |
Medium | 15 | Takt time |
Long | 20 | Takt time |
Heading | 8 | Takt |
Documentation
Definition
If a requirement quantity (for example, for capacity reasons) cannot be procured in a single lot, you have to schedule several receipts. In conjunction with the overlap indicator in the lot size (set in Customizing for the lot size), you can use the takt time to specify that these receipts are offset, that is, that they are delayed by the takt time.
You enter the takt time in workdays.
Use
The system uses the takt time if a requirement is covered by several receipt elements due to restrictions on lot size such as maximum lot size (with all lot-sizing procedures) or rounding value (with fixed lot size with splitting).
Dependencies
If a value was specified for the takt time in the material master, it is displayed here as the default value with the unit day.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in |