SAP ABAP Data Element T_ANZ (Total number of business event attendees)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷ PE (Application Component) Training and Event Management
⤷ PP09 (Package) Training and Event Management
⤷ PE (Application Component) Training and Event Management
⤷ PP09 (Package) Training and Event Management
Basic Data
Data Element | T_ANZ |
Short Description | Total number of business event attendees |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR5 | |
Data Type | CHAR | Character String |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Attend.no. |
Medium | 15 | Total atten.no. |
Long | 20 | Total attendee no. |
Heading | 5 | AtteN |
Supplementary Documentation - TRANZ 0001
Use
The interoperation time is required to calculate the lot size dependent in-house production time. The system then uses the in-house production time to determine basic dates for planned orders in materials planning.
Procedure
You can define work scheduling times in the material master record in one of two ways:
- Either you enter the in-house production time. If required, you can get the system to update this value from the routing.
- Or you enter the setup, teardown, processing, and interoperation times. If you maintain these values, the system determines the in-house production time on the basis of lot size.
History
Last changed by/on | SAP | 19970131 |
SAP Release Created in |