SAP ABAP Data Element SUM05 (Total of planned issues)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MD01 (Package) Appl. dev. R/3 consumption driven gen. requirements planning
Basic Data
Data Element SUM05
Short Description Total of planned issues  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 17    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PL_ISSUES   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Pl. issues 
Medium 15 Pl. issues 
Long 20 Planned issues 
Heading 13 Pl. issues 
Documentation

Definition

The following planned goods issues are taken into account in the total calculation:

  • Forecast requirements
  • Dependent requirements
  • Planned independent requirements
  • Requests for quotations
  • Quotations
  • Planned stock transfers (from purchase requisitions, planned orders)

History
Last changed by/on SAP  20040223 
SAP Release Created in 470