SAP ABAP Data Element STATE_D (Indicator: Row/column inactive?)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   FI-SL-IS (Application Component) Information System
     GRWT (Package) Report Painter / Report Writer
Basic Data
Data Element STATE_D
Short Description Indicator: Row/column inactive?  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Inactive 
Medium 15 Inactive 
Long 20 Inactive 
Heading
Documentation

Definition

If a report consists of several rows or columns, you can deactivate (suppress) individual rows or columns in the report. This can be very useful for reports in test status.

Possible entries:

  • 'X' = row/column is suppressed
  • ' ' = row/column is not suppressed

Supplementary Documentation - STATENDDTA0001

Use

The analysis period is needed to be able to find whether the total of the entered intensive care beds equals the number of set up intensive care beds - as results from the table TN10B for the institution (statistical bed capacity figures).

Since the bed capacity figures are maintained time-dependently, the specification of the analysis period is necessary.

Procedure

Examples

Dependencies

Supplementary Documentation - STATENDDTA0002

Use

End of the period in which the system searches for assignments of patients to the organizational unit specified.

Procedure

Examples

Dependencies

Supplementary Documentation - STATENDDTA0003

Use

The evaluation period determines which material requisitions are evaluated by the program. A material requisition is evaluated if the date on which it was created is after or identical to the start of the evaluation period and is before or identical to the end of the evaluation period.

Procedure

Examples

Dependencies

Supplementary Documentation - STATENDDTA0004

Use

Country version Switzerland (CH):

You can only specify 12/31 of the year as the end date for evaluation.

Please note that the end and start dates must be in the same year.

Dependencies

Example

History
Last changed by/on SAP  20010607 
SAP Release Created in