Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ NBAS (Package) Appl. development Hospital System master data, catalogs
Basic Data
Data Element | STATBEGDTA |
Short Description | IS-H: Start of Evaluation Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RI_DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Eval.Start |
Medium | 14 | Eval. Start |
Long | 20 | Eval. Period Start |
Heading | 10 | Eval.Start |
Documentation
Definition
The start date of the evaluation period. The only restriction to your entry is that this date must be before the end of the evaluation period.
Supplementary Documentation - STATBEGDTA0001
Use
The analysis period is needed to be able to find whether the total of the entered intensive care beds equals the number of set up intensive care beds - as results from the table TN10B for the institution (statistical bed capacity figures).
Since the bed capacity figures are maintained time-dependently, the specification of the analysis period is necessary.
Procedure
Examples
Dependencies
Supplementary Documentation - STATBEGDTA0002
Use
Start of the period in which the system searches for assignments of patients to the organizational unit specified.
Procedure
Examples
Dependencies
Supplementary Documentation - STATBEGDTA0003
Use
The evaluation period determines which material requisitions are evaluated by the program. A material requisition is evaluated if the date on which it was created is after or identical to the start of the evaluation period and is before or identical to the end of the evaluation period.
Procedure
Examples
Dependencies
Supplementary Documentation - STATBEGDTA0004
Use
Country version Switzerland (CH):
You can only enter 01/01 of the year as the start date for evaluation.
Please note that the start and end dates must be in the same year.
Dependencies
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |