SAP ABAP Data Element SPPERI_T (Planning Periods in Days)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-FLW-SEQ (Application Component) Sequencing
     LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element SPPERI_T
Short Description Planning Periods in Days  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name SP_PERIOD_DAY   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Day 
Medium 15 Days 
Long 30 Planning Periods in Days 
Heading 30 Planning Periods in Days 
Documentation

Definition

The planning periods for sequencing are determined in days.

The planning periods divide the period of examination in sequencing into different time segments. Sequencing carries out sequence planning for each of these time segments.

The system proceeds as follows:

  1. It determines all planned orders whose basic start dates lie within a certain planning period.
  2. It establishes the sequence for the planned orders according to the procedure specified in the procedure profile.

Use

Dependencies

If days are used as the basis for determining the planning periods, several days can be grouped together to form a planning period.

Example

History
Last changed by/on SAP  20100310 
SAP Release Created in 700