SAP ABAP Data Element SPPERI_S (Planning Periods in Shifts)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SPPERI_S |
Short Description | Planning Periods in Shifts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SP_PERIOD_SHIFT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Shift |
Medium | 15 | Shifts |
Long | 30 | Planning Periods in Shifts |
Heading | 30 | Planning Periods in Shifts |
Documentation
Definition
The planning periods for sequencing are determined in shifts.
The planning periods divide the period of examination in sequencing into different time segments. Sequencing carries out sequence planning for the planned orders for each of these time segments.
The system proceeds as follows:
- It determines all planned orders whose basic start dates lie within a certain planning period.
- It creates the sequence for these planned orders according to the procedure specified in the procedure profile.
Use
Dependencies
If shifts are used as the basis for determing the planning periods, the number of periods that can be grouped together is limited to one shift.
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |