SAP ABAP Data Element SPPER_CALC (Align Horizon Calculation with Current Date)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PP-FLW-SEQ (Application Component) Sequencing
     LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element SPPER_CALC
Short Description Align Horizon Calculation with Current Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name SP_PERIOD_CALCULATION   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Curr. Date 
Medium 15 Current Date 
Long 40 Align Horizon with Current Date 
Heading 40 Align Horizon with Current Date 
Documentation

Definition

Specifies that the period and horizon calculation is aligned on the current day.

Use

This indicator is relevant if you use planning periods of several days or a medium-term planning horizon.

  • If you do not set this indicator, the calculation of the planning periods or the end of the short-term planning horizon is aligned on the user-dependent period of examination in sequencing. The planning period calculation begins on the start date of the period of examination. The medium-term planning horizon is taken into account as an offset to the same date.
  • If you set this indicator, the calculation is made independently of the user parameters and is aligned on the current date. The current day is the first day of the current planning period. The medium-term planning horizon is taken into account as an offset to the current day.

Dependencies

Example

History
Last changed by/on SAP  20100310 
SAP Release Created in 700