SAP ABAP Data Element SPPER_CALC (Align Horizon Calculation with Current Date)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SPPER_CALC |
Short Description | Align Horizon Calculation with Current Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SP_PERIOD_CALCULATION | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Curr. Date |
Medium | 15 | Current Date |
Long | 40 | Align Horizon with Current Date |
Heading | 40 | Align Horizon with Current Date |
Documentation
Definition
Specifies that the period and horizon calculation is aligned on the current day.
Use
This indicator is relevant if you use planning periods of several days or a medium-term planning horizon.
- If you do not set this indicator, the calculation of the planning periods or the end of the short-term planning horizon is aligned on the user-dependent period of examination in sequencing. The planning period calculation begins on the start date of the period of examination. The medium-term planning horizon is taken into account as an offset to the same date.
- If you set this indicator, the calculation is made independently of the user parameters and is aligned on the current date. The current day is the first day of the current planning period. The medium-term planning horizon is taken into account as an offset to the current day.
Dependencies
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |