SAP ABAP Data Element SPHORIZON (Horizon Assignment of Planning Period)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-FLW-SEQ (Application Component) Sequencing
⤷
LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷
⤷
Basic Data
| Data Element | SPHORIZON |
| Short Description | Horizon Assignment of Planning Period |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | SPHORIZON | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Period |
| Medium | 15 | Horizon |
| Long | 20 | Horizon Assign. |
| Heading | 17 | Horizon Assign. |
Documentation
Definition
Indicates the horizon assignment of a planning period.
Use
The period of examination in sequencing is subdivided into a short-term area and a medium-term area, depending on the settings in the planning profile.
Sequencing dispatches planned orders only in the short-term period and firms them. In the medium-term period, Sequencing displays the planned orders in the section for non-dispatched orders.
Dependencies
Example
History
| Last changed by/on | SAP | 20100310 |
| SAP Release Created in | 700 |