SAP ABAP Data Element SPGBTIM (Start time)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SPGBTIM |
Short Description | Start time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TIME | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start Time |
Medium | 15 | Start time |
Long | 20 | Start time |
Heading | 13 | Start time |
Documentation
Definition
Specifies the start time of the evaluation period.
Use
The evaluation period is the period in which you can evaluate the respective operating time load of a visualization segment of the production line. Here, the data refers:
- To the complete production line if your production line does not have any sort buffers.
- To a partial line between two sort buffers if your production line does have sort buffers.
The evaluation period can be a shift, day, week or a month. Using the user-defined period split, you have a great degree of flexibility in setting the evaluation periods. For example, you can evaluate the first two days of the period of examination in shifts, the following two weeks in days and then the following two periods in weeks. The system then displays the rest of the period of examination in monthly periods in the sequence schedule.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in |