SAP ABAP Data Element SPDURA_S (Planning Period: Number of Shifts)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SPDURA_S |
Short Description | Planning Period: Number of Shifts |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SP_HDURA | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | SP_PERIOD_NUM_SHIFT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Shift |
Medium | 15 | Shifts |
Long | 40 | Planning Period: Number of Shifts |
Heading | 40 | Planning Period: Number of Shifts |
Documentation
Definition
The calculation of the planning periods in sequencing is carried out in shifts.
The planning periods divide the period of examination in sequencing into different time segments. Sequencing carries out sequence planning for the planned orders for each of these time segments.
The system proceeds as follows:
- It determines all planned orders whose basic start dates lie within a certain planning period.
- It establishes the sequence for these planned orders according to the procedure specified in the procedure profile.
Use
Dependencies
If shifts are used as the basis for determining the planning periods, the number of periods that can be grouped together is limited to one shift.
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |