SAP ABAP Data Element SP_PDURA (Dispatching period in days)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SP_PDURA |
Short Description | Dispatching period in days |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SP_HDURA | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Disp.per. |
Medium | 15 | Dispatch per. |
Long | 28 | Dispatch period |
Heading | 15 | Dispatch period |
Documentation
Definition
Determines the duration of the planning periods for Sequencing.
The planning period splits the period of examination into time periods. The system sequences the planned orders in each of the time periods.
The system proceeds as follows:
- It determines all planned orders whose order start date lies in a certain planning period.
- It creates the sequence for these planned orders according to the process defined in the processing profile.
Use
You can specify the number of days or shifts for which you want to carry out sequencing.
History
Last changed by/on | SAP | 19971104 |
SAP Release Created in |