SAP ABAP Data Element SP_GRPP1 (Radio button: Planning process 1)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
⤷ PP-FLW-SEQ (Application Component) Sequencing
⤷ LASP (Package) Application Development R/3 Logistics Automotive Sequencing
Basic Data
Data Element | SP_GRPP1 |
Short Description | Radio button: Planning process 1 |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 7 | Proc.1 |
Medium | 18 | Planning process 1 |
Long | 35 | Planning process 1 |
Heading | 35 | Planning process 1 |
Documentation
Definition
Selection of the processing profile for external optimization.
When scheduling planned orders, the system dispatches according to the sequence given by an external optimizing tool via the PP-POI interface. The optimization must be complete before starting the sequence schedule. The sequence numbers of the planned orders must be maintained by external programs. They are used in sequencing as the sequencing indicator.
History
Last changed by/on | SAP | 19970923 |
SAP Release Created in |