SAP ABAP Data Element SCHED_PLAN_DATE (Scheduled start date for call object)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       IPRM (Package) Application Development R/3 Preventive Maintenance
Basic Data
Data Element SCHED_PLAN_DATE
Short Description Scheduled start date for call object  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Start date 
Medium 15 Sched.StartDate 
Long 20 Scheduled start date 
Heading 10 Start date 
Documentation

Definition

Scheduled start date for the call object.

Use

Depending on the call object, this field is used as follows:

  • Maintenance call for orders
    Basic start date for the order
  • Maintenance call for service entry sheets
    'Period from' date for the service entry sheet
  • Maintenance call for notifications
    Desired start date for the notification

This date is determined differently, depending on the scheduling status:

  • Status on hold
    Date is determined by simulation from the maintenance plan scheduling.
  • Status called, completed
    Date is determined from the respective call object.
  • Status ignored
    Date, on which the maintenance plan scheduling was determined, remains.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19980505 
SAP Release Created in