SAP ABAP Data Element SCHED_PLAN_DATE (Scheduled start date for call object)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
IPRM (Package) Application Development R/3 Preventive Maintenance

⤷

⤷

⤷

Basic Data
Data Element | SCHED_PLAN_DATE |
Short Description | Scheduled start date for call object |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start date |
Medium | 15 | Sched.StartDate |
Long | 20 | Scheduled start date |
Heading | 10 | Start date |
Documentation
Definition
Scheduled start date for the call object.
Use
Depending on the call object, this field is used as follows:
- Maintenance call for orders
Basic start date for the order - Maintenance call for service entry sheets
'Period from' date for the service entry sheet - Maintenance call for notifications
Desired start date for the notification
This date is determined differently, depending on the scheduling status:
- Status on hold
Date is determined by simulation from the maintenance plan scheduling. - Status called, completed
Date is determined from the respective call object. - Status ignored
Date, on which the maintenance plan scheduling was determined, remains.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |