Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element | RUEK |
Short Description | Completion confirmation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | RUEK | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Confirm. |
Medium | 15 | Confirmation |
Long | 20 | Confirmations |
Heading | 5 | Conf. |
Documentation
Definition
This key specifies whether an object is to be confirmed if it has the control key you selected.
In addition, you can specify that milestone confirmations are carried out for an object in PP (Production Planning and Control) and PP-PI (Production Planning for Process Industries).
The confirmation indicator is taken into account for the following objects:
- operations and sub-operations in Quality Management (QM), Plant Maintenance (PM) and Production Planning (PP)
- activities and activity elements in the Project System (PS)
- phases and secondary resources in Production Planning for Process Industries (PP-PI)
Operations cannot be confirmed. The system ignores this indicator if it is set for operations.
Dependencies
An order has a final confirmation status once all operations, activities and phases specified for confirmation have been completely confirmed.
Supplementary Documentation - RUEK 1000
Definition
Use
Procedure
Enter the Confirmation key which needs to be set in the control key of an operation or phase, if process instructions are to be generated for this operation or phase.
Examples
Dependencies
Note
The system distinguishes between the entry of the initial value and the absence of an entry. In the latter case, the key is not taken into account.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |