SAP ABAP Data Element RM08V_UEBM (Number of higher-level material)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
MRM (Package) Appl.development R/3 decentralized invoice verification

⤷

⤷

⤷

Basic Data
Data Element | RM08V_UEBM |
Short Description | Number of higher-level material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MATNR | |
Data Type | CHAR | Character String |
Length | 18 | |
Decimal Places | 0 | |
Output Length | 18 | |
Value Table | MARA |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 18 | Higher-level mat. |
Documentation
Definition
Material above a (lower-level) material in a bill of materials.
For further information, see General information on materials
Use
A lower-level material is a component of the higher-level material to which it is assigned. A number of constraints therefore exist for lower-level materials within the hierarchy.
- A lower-level material cannot be included, excluded or reset (if this is not the case for the higher-level material).
- If a material to which other materials are assigned is included, excluded or reset, the lower-level materials are also included, excluded or reset.
- The amount for the lower-level material is taken into account in the calculation of the target amount (and thus the difference).
- No materials can be assigned to a lower-level material. sein.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |