Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KE0C (Package) Customizing for Profitability Analysis
Basic Data
Data Element | RKE_TRSTXT |
Short Description | Comment line for maintenance of summarization levels |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR83 | |
Data Type | CHAR | Character String |
Length | 83 | |
Decimal Places | 0 | |
Output Length | 83 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Documentation
Definition
This field contains a message when the summarization levels are not used. Change the settings if you want to use the levels.
- WARNING: Test mode active, summarization levels will not be used!
You have set the test mode under "Extras -> Test mode" so that the summarization levels will not be used. This function causes the system to ignore all (!) the summarization levels. This makes it possible for you to check whether you get the same results with and without the summarization levels. The message no longer appears after you change the setting under "Extras -> Test mode".
- WARNING: Summarization levels are not used in reports!
Your operating concern was created before Release 3.0C. If this is the case, your reports will automatically continue using the summarization data from Release 2.2 instead of the summarization levels. Define summarization levels for your reports, and then activate their use under the menu option "Extras -> Information system". After this the summarization data will no longer be required. For more information, see the online manual and Customizing.
To make it easier for you to switch to using summarization levels in reports, you can use the function "Extras -> Create proposal", which creates summarization levels which suit a number of reports.
History
Last changed by/on | SAP | 19960423 |
SAP Release Created in |