SAP ABAP Data Element RIZBS (Determine pick/pack time)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       VBAS (Package) Application development R/3 sales master data
Basic Data
Data Element RIZBS
Short Description Determine pick/pack time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RIZBS    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PickPackT. 
Medium 15 Det.PickPackTi. 
Long 20 Det.pick/pack time 
Heading PckTi 
Documentation

Definition

Indicates whether the system automatically determines a time estimate for picking and packing when you process deliveries through this shipping point.

You have the following options:

  • no pick/pack time determination

No pick/pack time is determined.

  • A Route-dependent
  • A route-dependent pick/pack time is determined.

The influencing factors are:
in the order the shipping point, the route and the weight group
' ',
in the delivery the shipping point, the route and the weight group for the delivery.

  • B Route-independent
  • A route-independent pick/pack time is determined.

Influencing factors are:
in the order the shipping point, the route
' ' and the weight group
' ',
in the delivery the shipping point, the route
' ' and the weight group of the delivery.

  • C Default from shipping point
  • Only the pick/pack time defined in the shipping point is used.

Remember that incomplete Customizing can lead to incorrect scheduling especially for route dependent / route-independent pick/pack times. Make sure that all combinations of shipping point, route and weight group are considered in Customizing.

Use

The pick/pack time is the time difference between the material availability date / time and loaing date / time. It is used in transportation scheduling and deliver scheduling.

Dependencies

The system only determines the pick/pack time if you have marked the Delivery scheduling field where you define sales document types in SD Customizing.

History
Last changed by/on SAP  19971002 
SAP Release Created in