SAP ABAP Data Element RERATPDUEDTCNDS (Control of Due Dates with Summarization)
Hierarchy
EA-FIN (Software Component) EA-FIN
   RE-FX-RA (Application Component) Rental Accounting
     RE_RA_CA (Package) RE: Cross Application Rental Accounting
Basic Data
Data Element RERATPDUEDTCNDS
Short Description Control of Due Dates with Summarization  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type RERATPDUEDTCNDS    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 DueDtContr 
Medium 15 DueDate Control 
Long 20 Control of Due Dates 
Heading DDCt 
Documentation

Definition

Taking account of due date in summarized line items.

Use

You can make the following settings:

  • Only Summarize If Due Date the Same
  • Maximum Due Date

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the maximum (or latest) date of all summarized line items.

  • Maximum Due Date (Priority Receivable)

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the maximum (or latest) due date of the receivable items. If no receivable item is used in the summarized item, then the maximum due date of the credit memo item is used.

  • Maximum Due Date (Priority Credit Memo)

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the maximum (or latest) due date of the credit memo items. If no credit memo item is used in the summarized item, then the maximum due date of the receivable item is used.

  • Minimum Due Date

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the minimum (or earliest) due date of all summarized line items.

  • Minimum Due Date (Priority Receivable)

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the minimum (or earliest) due date of the receivable items. If no receivable item is used in the summarized item, then the minimum due date of the credit memo item is used.

  • Minimum Due Date (Priority Credit Memo)

    The summarizable items without the Due Date criterion are summarized. The due date of the summarized item is the minimum (or earliest) due date of the credit memo items. If no credit memo item is used in the summarized item, then the minimum due date of the receivable item is used.

Dependencies

Example

History
Last changed by/on SAP  20040114 
SAP Release Created in 500