Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QB (Package) QM in procurement
Basic Data
Data Element | QZGREQ |
Short Description | Certificate Required |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Cert reqd |
Medium | 15 | Cert required |
Long | 20 | Certificate required |
Heading | 2 | Ct |
Documentation
Definition
Use
If this indicator is set, a certificate must be submitted with the delivered goods.
With requests for quotations and purchase orders, the vendor is informed of the certificate requirement and certificate type.
At goods receipt, the system checks whether the receipt of a certificate has been already confirmed in the purchase order.
If this is not the case, the system responds as specified in the controls for the certificate type.
For example, the system can set a corresponding status in the goods receipt inspection lot. The receipt of the certificate must be confirmed at the latest when the usage decision is made.
If enhanced certificate processing is active, the system creates a certificate document at goods receipt. You can use this document to manage the certificate receipt independently.
Dependencies
You enter the certificate type in the material master.
When you define the certificate type and the related activities for certificate processing, you specify:
- Whether the certificate must be submitted once for each purchase order item or goods receipt
- How the system responds if a required certificate is not submitted
- Whether the receipt of the certificate is to be managed independently of the goods receipt.
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |