SAP ABAP Data Element QVORLABN (Lot Creation Lead Time (in Days) for Source Inspection)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QB (Package) QM in procurement
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QB (Package) QM in procurement
Basic Data
Data Element | QVORLABN |
Short Description | Lot Creation Lead Time (in Days) for Source Inspection |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QANZAHL1 | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Lead time |
Medium | 15 | Lead time(days) |
Long | 20 | Lead time (in days) |
Heading | 0 |
Documentation
Use
The lead time is deducted from the scheduled delivery date and defines the start date for the inspection.
Procedure
You should specify a lead time (in days) so that an incoming inspection can be performed punctually before the delivery date.
Notes
If you want scheduling agreement schedule lines to be generated automatically for the material, the lead time should be smaller than the firm/ trade-off zone. This ensures that no source inspections are created if scheduling agreement schedule lines are deleted again in the material requirements planning run.
History
Last changed by/on | SAP | 19950401 |
SAP Release Created in |