SAP ABAP Data Element QPRSTART (Inspection Start Date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QL (Package) QM inspection lots
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QL (Package) QM inspection lots
Basic Data
Data Element | QPRSTART |
Short Description | Inspection Start Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | INSPECTION_STARTS_ON_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start |
Medium | 15 | Start date |
Long | 20 | Insp. start date |
Heading | 9 | StartDate |
Documentation
Procedure
When an inspection lot is created, you can enter either the start date or the end date of the inspection.
In the Quality Management view of the material master you can specify the average inspection duration (in days) for each inspection type. The system uses this inspection duration to calculate either the start or the end inspection date.
Dependencies
When an inspection lot is created automatically for a goods receipt, the goods receipt date is copied over to the inspection lot as the planned starting date of the inspection.
When an inspection lot is created for a production order, the scheduled start of the order is used as the planned starting date.
History
Last changed by/on | SAP | 19980428 |
SAP Release Created in |