Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ QL (Package) QM inspection lots
Basic Data
Data Element | QDYN |
Short Description | Skips Allowed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | QKZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | IND_SKIPS_ALLOWED | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SkipsAllwd |
Medium | 15 | Skips allowed |
Long | 20 | Skips allowed |
Heading | 4 | Skip |
Documentation
Use
If you set this indicator, skips are allowed for inspection characteristics during sample calculation.
If you do not set this indicator, the system chooses the next inspection stage in the dynamic modification rule that is not a skip, instead of the skip defined in the quality level during sample calculation.
Procedure
Examples
Dependencies
You can prevent skips for individual characteristics by assigning:
- A characteristic weighting to the inspection characteristics that does not allow skips
- Sampling procedures to the inspection characteristics that do not allow a stage change
Dependent functions
If all the inspection characteristics, which must be inspected at an inspection lot, have skip status, a skip lot exists.
If both skips and automatic usage decisions are allowed, inspection lot processing occurs without the user's intervention for a skip lot. In Customizing, you can set a time delay for this.
At goods receipt a ship-to-stock occurs since the inspection lot quantity is immediately posted to unrestricted use stock.
Note
In addition to a skip lot, skips can also occur if you:
- Define that no receiving inspections occur in the control for quality management in procurement (quality info record)
- Define in the inspection setup for the material in the quality management view of the material master, that an inspection only occurs at the first goods receipt for each purchase order or production order
Supplementary Documentation - QDYNREGEL 0001
Use
On the basis of different inspection stages, the system can vary the inspection scopes. If the inspection scopes remain the same, other conditions for an inspection stage change are applicable.
You can store a dynamic modification rule in one of the following places:
- In the inspection plan at the header level
- In the inspection plan at the characteristic level
- In the material master record (for the inspection type in the QM inspection data)
If you want to dynamically modify the inspection scope without referencing a task list and/or material specification.
Procedure
Examples
Dependencies
Supplementary Documentation - QDYNREGEL 0002
Use
If you enter the identifier of a dynamic modification rule that already exists, the system copies all values associated with this rule and proposes them as the values for the dynamic modification rule that you are creating.
Procedure
Enter the identifier for a dynamic modification rule that already exists.
Supplementary Documentation - QDYNREGEL 0003
Use
This field is only relevant if you inspect a material without using a task list or material specification.
If you enter a dynamic modification rule in this field, the system maintains a quality level for the material, plant, and inspection type. If the quality level is created automatically, the system determines the dynamic modification criteria via the inspection lot origin.
Procedure
Examples
Dependencies
If you also use a sampling procedure to determine the sample size, the system checks whether the dynamic modification rule and sampling procedure are compatible (see Allowed Relationships).
History
Last changed by/on | SAP | 19990105 |
SAP Release Created in |