SAP ABAP Data Element PW_BEGUZ (Start time)
Hierarchy
☛
SAP_ABA (Software Component) Cross-Application Component
⤷ CA-GTF (Application Component) General Application Functions
⤷ BPIW (Package) Cross-Application Objects in HR Incentive Wages/PDC
⤷ CA-GTF (Application Component) General Application Functions
⤷ BPIW (Package) Cross-Application Objects in HR Incentive Wages/PDC
Basic Data
Data Element | PW_BEGUZ |
Short Description | Start time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | UZEIT | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | CONFSTART1 | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 8 | Start |
Medium | 15 | Start time |
Long | 11 | Start |
Heading | 8 | Start |
Documentation
Definition
Enter the start time for the activity type in this field. The time specified refers to the actual value.
If you also enter an end time for the activity types labor time, machine time, teardown time and setup time, the system calculates the actual time. You can use the incentive wage parameters to determine whether the system should take account of the breaks specified in the daily work schedule.
The actual time is calculated for the variable activity type only if you enter a time unit for the actual value.
History
Last changed by/on | SAP | 19980909 |
SAP Release Created in |