SAP ABAP Data Element PSEISCST502 (PS key figure: plan costs in object currency)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-IS-REP (Application Component) Project Reports
     KAP6 (Package) Project Information System Data Export into R/3 EIS
Basic Data
Data Element PSEISCST502
Short Description PS key figure: plan costs in object currency  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan costs 
Medium 20 Plan costs in OC 
Long 27 Plan costs in obj. currency 
Heading 27 Plan costs in obj. currency 
Documentation

Definition

Value in object currency, showing the costs calculated and planned manually, along with the statistical planned costs in the project for plan version 0. As far as orders for the project are concerned, the value includes only appended orders.

History
Last changed by/on SAP  19980414 
SAP Release Created in