SAP ABAP Data Element PSEISCST502 (PS key figure: plan costs in object currency)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PS-IS-REP (Application Component) Project Reports
⤷
KAP6 (Package) Project Information System Data Export into R/3 EIS
⤷
⤷
Basic Data
| Data Element | PSEISCST502 |
| Short Description | PS key figure: plan costs in object currency |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | WERTV8 | |
| Data Type | CURR | Currency field, stored as DEC |
| Length | 15 | |
| Decimal Places | 2 | |
| Output Length | 21 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Plan costs |
| Medium | 20 | Plan costs in OC |
| Long | 27 | Plan costs in obj. currency |
| Heading | 27 | Plan costs in obj. currency |
Documentation
Definition
Value in object currency, showing the costs calculated and planned manually, along with the statistical planned costs in the project for plan version 0. As far as orders for the project are concerned, the value includes only appended orders.
History
| Last changed by/on | SAP | 19980414 |
| SAP Release Created in |