SAP ABAP Data Element PSDAT (Pricing Date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKEK (Package) Cost accounting unit costing
⤷ CRM-CIC (Application Component) Interaction Center WinClient
⤷ KKEK (Package) Cost accounting unit costing
Basic Data
Data Element | PSDAT |
Short Description | Pricing Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Price Date |
Medium | 15 | Pricing Date |
Long | 20 | Pricing Date |
Heading | 10 | Price Date |
Documentation
Definition
Date on which the price for the material and the planned standard rate for the activity types are to be calculated.
If the reference object of the cost estimate is a CO production order, this date determines the start date of the order.
Procedure
When you create a cost estimate, the current date appears in this field. You can overwrite this date if required.
Note:
If you create a material cost estimate without quantity structure, you cannot overwrite this date. The system uses the valuation date from the date control ID.
Supplementary Documentation - PSDAT 0001
Use
Procedure
Examples
Dependencies
If the reference object of the cost estimate is a CO production order, this date determines the start of the order.
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |