SAP ABAP Data Element PS_PWHIE (WBS currency (project definition))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element | PS_PWHIE |
Short Description | WBS currency (project definition) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WAERS | |
Data Type | CUKY | Currency key, referenced by CURR fields |
Length | 5 | |
Decimal Places | 0 | |
Output Length | 5 | |
Value Table | TCURC |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PROJECT_CURRENCY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proj.curr. |
Medium | 15 | Proj.currency |
Long | 20 | Project currency |
Heading | 5 | PjCur |
Documentation
Definition
The system defaults the currency from the project definition as the object currency for each newly created WBS element.
You can change the object currency for a WBS element in the organizational data for the WBS element, provided no costs or payments have been posted yet in the WBS element.
Dependencies
Note the following when you change the object currency for a WBS element:
- If the controlling area and company code have the same currency, then you can specify an object currency for the work breakdown structure which is different. This currency becomes the project currency.
- If the controlling area and company code have different currencies, the company code currency is the project currency.
History
Last changed by/on | SAP | 20010427 |
SAP Release Created in |