SAP ABAP Data Element PS_FLGVRG (Indicator: Bottom-up calculation with activity dates)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element | PS_FLGVRG |
Short Description | Indicator: Bottom-up calculation with activity dates |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PS_FLGVRG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | with act. |
Medium | 16 | Calc. with act. |
Long | 21 | Calculate with act. |
Heading | 3 | Act |
Documentation
Definition
You use this indicator to specify that dates from the assigned network activities should be taken into account during WBS scheduling.
History
Last changed by/on | SAP | 20010427 |
SAP Release Created in |