SAP ABAP Data Element PS_BESTAND (Project stock)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
⤷ SRM-EBP (Application Component) Enterprise Buyer
⤷ CN (Package) R/3 Application development: PS Basic data
Basic Data
Data Element | PS_BESTAND |
Short Description | Project stock |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PROJECT_STOCK | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proj.stock |
Medium | 15 | Project stock |
Long | 20 | Project stock |
Heading | 1 | S |
Documentation
Definition
Use this indicator to specify for materials requirements planning (MRP)/procurement whether the project has its own stock.
With project stock you can for instance:
- In multi-level production, keep track of the cost in a work breakdown structure in a detailed manner.
- Examine the material components required in a project with regard to inventory management or MRP planning seperately. This is particularly useful for components that have a long procurement lead time.
In valuated project stock the materials are managed on both a quantity basis and a value basis; all goods movements trigger corresponding postings in the stock accounts in Financial Accounting.
Notes
The indicator is copied as a default value from the project profile; it can be changed in the control data when you create a project. It is valid for all WBS elements.
The indicator cannot be changed after you have saved the project definition.
History
Last changed by/on | SAP | 20010427 |
SAP Release Created in |