SAP ABAP Data Element PRTCHG_PCNF (Change a PRT, if activity is partially confirmed)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
PP-SFC (Application Component) Production Orders
⤷
COCM (Package) Application development Order Change Management
⤷
⤷
Basic Data
| Data Element | PRTCHG_PCNF |
| Short Description | Change a PRT, if activity is partially confirmed |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | OCM_CONFLICT | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | OpPartConf |
| Medium | 20 | Op.part. confirmed |
| Long | 30 | Change: Op.partially confirmed |
| Heading | 10 | OpPartConf |
Documentation
Definition
Indicator specifying how changing a production resource/tool for a partially confirmed operation is dealt with in change management.
Use
This indicator is valid in order change management for a change profile.
You use this indicator to decide whether the above-named action represents a conflict and whether the conflict is an information message, a warning or an error.
History
| Last changed by/on | SAP | 19980323 |
| SAP Release Created in |