SAP ABAP Data Element PROAB (Forecast flow control)
Hierarchy
☛
SAP_BASIS (Software Component) SAP Basis Component
⤷
BC-SRV-BSF (Application Component) Business Service Functions
⤷
SPRG (Package) Forecast Basis Separation
⤷
⤷
Basic Data
| Data Element | PROAB |
| Short Description | Forecast flow control |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR10 | |
| Data Type | CHAR | Character String |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Fcst flow |
| Medium | 15 | Forecast flow |
| Long | 20 | Fcst flow control |
| Heading | 10 | Fcst flow |
Documentation
Definition
Indicator sequence that specifies which activities the system has carried out in the forecast.
The indicators and their meanings are listed below:
I The system has carried out an initialization.
M The initialization has been carried out manually.
1 The system has chosen a model using model selection procedure 1.
2 The system has chosen a model using model selection procedure 2.
P The system has optimized the parameters.
X The system has carried out an ex-post forecast.
T The system has carried out a trend test.
J The system has discovered a trend.
S The system has discovered carried out a seasonal test.
A The system has discovered seasonal fluctuations.
History
| Last changed by/on | SAP | 19950302 |
| SAP Release Created in |