SAP ABAP Data Element PREQ_COVER_TYP (Period Factor for Determining Availability Date/Time)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   CA (Application Component) Cross-Application Components
     PDS_MAINTAIN (Package) Maintenance of Additional Data for Production Data Structure
Basic Data
Data Element PREQ_COVER_TYP
Short Description Period Factor for Determining Availability Date/Time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PREQ_COVER_TYPE    
Data Type DEC   Counter or amount field with comma and sign 
Length 4    
Decimal Places 3    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Per.Factor 
Medium 15 Period Factor 
Long 20 Period Factor 
Heading 55 Period Factor for Determining Availability Date/Time 
Documentation

Definition


Factor used by the system to calculate the availability date/time of a receipt element within a time period (bucket).

Use

The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.

The following applications can take the period factor into account:

  • Heuristic in Supply Network Planning (SNP)

    The SNP optimizer does not consider any period factor.

  • Period lot-sizing procedure in Production Planning and Detailed Scheduling (PP/DS).

Usage in the SNP Heuristic

The system uses the period factor to calculate the availability date. It sets the availability time automatically to 12:00 within daily buckets.

The following period factors are relevant for the SNP heuristic:

  • Period Factor in the Location Product Master

    You must set the 'Use Period Factor' indicator in order for the SNP heuristic to take the period factor into account. If you do not set the indicator, the system always uses the standard value 0.5 for the period factor.

  • Period Factor in the Production Data Structure

    If you have defined a value for the period factor for the SNP heuristic in a production data structure, the system first considers this value when calculating the availability date/time. If you have not defined a value in the PDS or transportation lane, the system checks if you have set the Period Factor indicator in the location product master. If this is the case, the system takes the value defined in the Period Factor field of the location product master into consideration. If neither parameter has been maintained in the location product master, the system uses the standard value 0.5, meaning that it sets the availability date/time to the middle of the period.

Usage in the PP/DS Period Lot-Sizing Procedure

You must set the 'Use Period Factor' indicator in order for PP/DS to consider the period factor from the location product master in the period lot-sizing procedure. The system calculates the availability date/time from the period duration, to the exact second. If, for example, you specify 0.75 for the period factor, for a period duration of one day, the availability time is 18:00. The period factor in the production data structure is not relevant to PP/DS.

History
Last changed by/on SAP  20050219 
SAP Release Created in 600