Hierarchy
⤷ CA (Application Component) Cross-Application Components
⤷ PDS_MAINTAIN (Package) Maintenance of Additional Data for Production Data Structure
Basic Data
Data Element | PREQ_COVER_TYP |
Short Description | Period Factor for Determining Availability Date/Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PREQ_COVER_TYPE | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 4 | |
Decimal Places | 3 | |
Output Length | 5 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Per.Factor |
Medium | 15 | Period Factor |
Long | 20 | Period Factor |
Heading | 55 | Period Factor for Determining Availability Date/Time |
Documentation
Definition
Factor used by the system to calculate the availability date/time of a receipt element within a time period (bucket).
Use
The system determines the exact availability date/time of the receipt elements within a period, by adding a time interval (that it gets by multiplying the period factor with the period length) to the start time of the period. You can enter a factor between 0 and 1, where 0 is the start of the period, 0.5 the middle, and 1 the end of the period. When calculating the availability date/time, the system takes into consideration all weekdays, meaning that it does not take into consideration any days that have been defined as non-workdays in the calendars.
The following applications can take the period factor into account:
- Heuristic in Supply Network Planning (SNP)
The SNP optimizer does not consider any period factor.
- Period lot-sizing procedure in Production Planning and Detailed Scheduling (PP/DS).
Usage in the SNP Heuristic
The system uses the period factor to calculate the availability date. It sets the availability time automatically to 12:00 within daily buckets.
The following period factors are relevant for the SNP heuristic:
- Period Factor in the Location Product Master
You must set the 'Use Period Factor' indicator in order for the SNP heuristic to take the period factor into account. If you do not set the indicator, the system always uses the standard value 0.5 for the period factor.
- Period Factor in the Production Data Structure
If you have defined a value for the period factor for the SNP heuristic in a production data structure, the system first considers this value when calculating the availability date/time. If you have not defined a value in the PDS or transportation lane, the system checks if you have set the Period Factor indicator in the location product master. If this is the case, the system takes the value defined in the Period Factor field of the location product master into consideration. If neither parameter has been maintained in the location product master, the system uses the standard value 0.5, meaning that it sets the availability date/time to the middle of the period.
Usage in the PP/DS Period Lot-Sizing Procedure
You must set the 'Use Period Factor' indicator in order for PP/DS to consider the period factor from the location product master in the period lot-sizing procedure. The system calculates the availability date/time from the period duration, to the exact second. If, for example, you specify 0.75 for the period factor, for a period duration of one day, the availability time is 18:00. The period factor in the production data structure is not relevant to PP/DS.
History
Last changed by/on | SAP | 20050219 |
SAP Release Created in | 600 |