SAP ABAP Data Element POSVZEIT (Lead time for POS outbound processing)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WPOS (Package) IS-R: POS interface
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ WPOS (Package) IS-R: POS interface
Basic Data
Data Element | POSVZEIT |
Short Description | Lead time for POS outbound processing |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | POSVLZEIT | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Lead time |
Medium | 15 | Lead time |
Long | 20 | Lead time |
Heading | 0 |
Documentation
Definition
Defines the number of days for which data is to be prepared.
Use
In the relevant change message, the system takes acccount of all the changes within this lead time.
Dependencies
The system does not include weekends or public holidays in the lead time.
The lead time must have a value of at least 2, because the day of creation is always included in the lead time.
Example
A lead time of 2 days means that the data for today and tomorrow (i.e. one day in the future) is prepared and transferred.
If the system creates the message on a Friday, data up to Monday is taken into account (Saturday and Sunday are not working days).
History
Last changed by/on | SAP | 19971006 |
SAP Release Created in |