SAP ABAP Data Element POSCHG_PCNF_PS (Change activity element, if activity is partially confirmed)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | POSCHG_PCNF_PS |
Short Description | Change activity element, if activity is partially confirmed |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | OCM_CONFLICT | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ActPrtConf |
Medium | 20 | Activity part. conf. |
Long | 30 | Change: Activity part. conf. |
Heading | 10 | ActPrtConf |
Documentation
Definition
Indicator that determines how changes to activty elements that belong to an activity that has already been partially confirmed are treated by configuration change management for networks.
Use
This indicator is valid in order change management for a change profile.
You use this indicator to decide whether the above-named action represents a conflict and whether the conflict is an information message, a warning or an error.
History
Last changed by/on | SAP | 19980505 |
SAP Release Created in |