SAP ABAP Data Element PODAT (Date (proof of delivery))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ VL (Package) WS-SHP: General Processing for Shipping
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ VL (Package) WS-SHP: General Processing for Shipping
Basic Data
Data Element | PODAT |
Short Description | Date (proof of delivery) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | DAT | |
Default Component name | POD_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | POD date |
Medium | 15 | POD date |
Long | 23 | Proof of delivery date |
Heading | 10 | POD date |
Documentation
Definition
Date when the proof of delivery (POD) was confirmed for a delivery.
Use
The POD date is the same as the verification date if the ship-to party verifies receipt of the goods with no differences. In such a case, the delivery is automatically confirmed at the same time.
However, if differences are reported, the POD date is set when manual confirmation occurs.
History
Last changed by/on | SAP | 20050409 |
SAP Release Created in |