SAP ABAP Data Element PLINT_T (Indicator 'Integrated Planning' for Cost Object Category)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷
CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷
KKB (Package) Reporting for Costing
⤷
⤷
Basic Data
| Data Element | PLINT_T |
| Short Description | Indicator 'Integrated Planning' for Cost Object Category |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Int.Plan. |
| Medium | 15 | Integ. Planning |
| Long | 20 | Integrated Planning |
| Heading | 3 | IPl |
Documentation
Definition
This indicator determines, if a cost object plays a role in integrated planning or not. This is defined according to cost object categories in customizing.
The costs associated with an integrated planning cost object/ activity inputs are updated if 'integrated planning' is activated in the version: maintain plan versions .
The planning data is then passed on to the profit center and the general ledger.
History
| Last changed by/on | SAP | 19990223 |
| SAP Release Created in |