Hierarchy
⤷ LO-MD-BP-VM (Application Component) Vendor Master
⤷ WPDTC (Package) Calculation of Planned Delivery Time
Basic Data
Data Element | PLIFZ_CALC |
Short Description | Calculated Planned Delivery Time |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DEC3 | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PLIFZ_CALC |
Medium | 19 | Calc. Plnd Del.Time |
Long | 25 | Calc. Plnd Del. Time |
Heading | 25 | Calc. Plnd Del. Time |
Documentation
Definition
The planned delivery time calculated from the individual deliveries.
The planned delivery time is calculated from the arithmetic mean of the delivery times that were determined from the difference between the purchase order date and goods receipt date.
The arithmetic mean is created at the following levels:
- Info record / purchasing organization / plant / vendor / vendor subrange / material level
By default, a weighting of partial deliveries is included in the mean calculation of value. This weighting can be switched off when the report is started. Other mean values may be produced, however.
Different mean values may be produced for the same folder (for example, purchase info records) by creating the mean values for the planned delivery time on a very specific level.
It is possible to display these critical data records using the relevant radio buttons. It is then up to the user to select the value for the planned delivery time.
History
Last changed by/on | SAP | 20020124 |
SAP Release Created in | 470 |