SAP ABAP Data Element PLIFZ_BI (Planned Delivery Time in Days (BTCI))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MG (Package) Application development R/3 material master prior to 3.0
Basic Data
Data Element | PLIFZ_BI |
Short Description | Planned Delivery Time in Days (BTCI) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR03 | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd Dely |
Medium | 15 | PDT |
Long | 20 | Planned Deliv. Time |
Heading | 3 | PDT |
Documentation
Definition
Number of calendar days needed to obtain the material or service if it is procured externally.
Use
Procedure
If you have different vendors for a material, you must specify an average value. The same applies if you order the material from a fixed vendor that has varying delivery times.
Examples
Dependencies
If you use the SAP Retail System, the planned delivery time can be suggested from the vendor sub-range in the vendor master record.
History
Last changed by/on | SAP | 19971006 |
SAP Release Created in |