SAP ABAP Data Element PLANKOST_GO (Total Plan Costs in Object Currency)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | PLANKOST_GO |
Short Description | Total Plan Costs in Object Currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Total plan |
Medium | 15 | Tot. plan costs |
Long | 20 | Total plan costs OC |
Heading | 18 | Total plan costs |
Documentation
Definition
Total amount of planned costs, shown in object currency or company code currency.
Use
Value of the costs planned on cost objects. In Cost Object Controlling, the planned costs for a manufacturing order are generally obtained from the preliminary cost estimate for the manufacturing order. The cost object is debited with planned costs for materials consumed, activities consumed, and overhead costs in accordance with the costed quantity structure.
History
Last changed by/on | SAP | 19980514 |
SAP Release Created in |