Hierarchy
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | PLANKOST_G |
Short Description | Total Plan Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Total plan |
Medium | 15 | Tot. plan costs |
Long | 20 | Total plan costs |
Heading | 18 | Total plan costs |
Documentation
Definition
Total value of the planned costs with which cost objects are debited and credited.
This value is calculated in the following formula:
Total planned costs = Planned cost debit + Planned cost credit
Use
In Cost Object Controlling, the planned debit of a manufacturing order is obtained from a preliminary cost estimate for the order. In accordance with the costed quantity structure, the order is debited with planned costs for material consumption, internal activity consumption, and overhead and process costs.
The planned credit of a manufacturing order comes from the delivery of the order to stock. The planned quantity of the order is valuated with the planned price according to the price control.
The total value of the planned costs is the sum of the planned debits and planned credits.
History
Last changed by/on | SAP | 20000201 |
SAP Release Created in |