SAP ABAP Data Element PLANKOST_F (Plan Fixed Costs)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-IS (Application Component) Product Cost Controlling Information System
     KKB (Package) Reporting for Costing
Basic Data
Data Element PLANKOST_F
Short Description Plan Fixed Costs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short Plan fxd 
Medium 14 Plan fxd costs 
Long 20 Plan fixed costs 
Heading 18 Plan fixed costs 
Documentation

Definition

Fixed portion of the total planned costs with which cost objects were debited and credited.

This value is calculated in the following formula:

Fixed planned costs = Total planned costs - Variable planned costs

Use

In Cost Object Controlling, the planned debit of a manufacturing order is obtained from a preliminary cost estimate for the order. In accordance with the costed quantity structure, the order is debited with planned costs for material consumption, internal activity consumption, and overhead and process costs.

The planned credit of a manufacturing order comes from the delivery of the order to stock. The planned quantity of the order is valuated with the planned price according to the price control.

The total value of the planned costs is the sum of the planned debits and planned credits.

The fixed portion of the total value consists of the costs that do not vary with the operating rate and lot size. For example, setup costs are fixed because they remain the same for different lot sizes.

History
Last changed by/on SAP  20000201 
SAP Release Created in