SAP ABAP Data Element PLANENTL_GK (Plan Cost Credit in Controlling Area Currency)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   CO-PC-IS (Application Component) Product Cost Controlling Information System
     KKB (Package) Reporting for Costing
Basic Data
Data Element PLANENTL_GK
Short Description Plan Cost Credit in Controlling Area Currency  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERTV8    
Data Type CURR   Currency field, stored as DEC 
Length 15    
Decimal Places 2    
Output Length 21    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plan CR 
Medium 16 Plan Cost Credit 
Long 20 Plan Cost Credit CAC 
Heading 21 Plan Credit 
Documentation

Definition

Total amount of the planned costs with which cost objects were credited, shown in controlling area currency.

Use

Value of the planned credit of cost objects. In Cost Object Controlling, the planned costs for a manufacturing order are generally obtained from the preliminary cost estimate for the manufacturing order. The cost object is debited with planned costs for materials consumed, activities consumed, and overhead costs in accordance with the costed quantity structure. The planned credit of a manufacturing order is obtained from the planned delivery of the order to stock.

History
Last changed by/on SAP  19980218 
SAP Release Created in