SAP ABAP Data Element PLANBEL_GO (Plan Cost Debit in Object Currency)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
⤷ CO-PC-IS (Application Component) Product Cost Controlling Information System
⤷ KKB (Package) Reporting for Costing
Basic Data
Data Element | PLANBEL_GO |
Short Description | Plan Cost Debit in Object Currency |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV8 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 15 | |
Decimal Places | 2 | |
Output Length | 21 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan debit |
Medium | 15 | Plan debit |
Long | 20 | Plan cost debit OC |
Heading | 18 | Plan debit |
Documentation
Definition
Total amount of the planned costs with which the cost objects were debited, shown in object currency or company code currency.
Use
Value of the planned debit of cost objects. In Cost Object Controlling, the planned costs for a manufacturing order are generally obtained from the preliminary cost estimate for the manufacturing order. The cost object is debited with planned costs for materials consumed, activities consumed, and overhead costs in accordance with the costed quantity structure. The planned credit of a manufacturing order is obtained from the planned delivery of the order to stock.
History
Last changed by/on | SAP | 19980514 |
SAP Release Created in |