SAP ABAP Data Element PK_PLND_CHG (Control Cycles with Flagged Kanbans Only)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD05 (Package) Development class KANBAN
Basic Data
Data Element | PK_PLND_CHG |
Short Description | Control Cycles with Flagged Kanbans Only |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Flagged Ks |
Medium | 15 | Flagged Kanbans |
Long | 20 | Flagged Kanbans |
Heading | 19 | Flagged Kanbans |
Documentation
Definition
Specifies that the system is to select only those control cycles that have kanban containers that are flagged for unlocking.
Kanbans that are flagged for unlocking arise only through changes in the number of kanbans in the control cycle as a result of:
- The kanban calculation (transaction PK08 or PK08N)
- Manual adjustment in control cycle maintenance (transaction PKMC), whereby the control cycle already existed with some kanbans before the manual adjustment
- Use of the BAPI BAPI_KANBANCC_CHANGE
Use
If you set the indicator, the system selects only those control cycles with flagged kanbans and displays them in a list. You can then unlock these kanban containers.
Dependencies
The system only generates kanbans that are flagged for unlocking if you have chosen one of the options Lock New Kanbans from Kanban Calculation or Always Lock New Kanbans in the Lock New Kanbans field in the activity Define Strategies for Adopting Calculation Proposals in Customizing for Kanban.
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |